How to Prevent Shrinking and Cracking in Concrete

Concrete cracking is one of the most common issues that can compromise the durability and aesthetics of concrete structures. Cracks can appear due to several reasons, including shrinkage, temperature changes, load stress, and poor practices in mix design, production, placing, or curing. In this article, we’ll discuss the primary types of cracking, their causes, and practical ways to prevent them at each stage of concrete production.

1. Types of Concrete Cracking

To understand how to prevent cracking, it’s essential to identify the most common types of cracks and their causes:

  1. Plastic Shrinkage Cracks: These cracks appear in the early stages of concrete setting, typically within the first few hours after placement. They result from rapid moisture loss, causing the surface to shrink while the underlying concrete remains static.
  2. Drying Shrinkage Cracks: These cracks form as the concrete cures and moisture evaporates from the structure. Drying shrinkage occurs over time and is exacerbated by improper mix design and curing practices.
  3. Thermal Cracks: Thermal expansion and contraction due to temperature fluctuations can cause these cracks. They often occur in large structures where concrete experiences uneven cooling.
  4. Structural or Load-Induced Cracks: These cracks are caused by excessive loading or poor structural design, leading to stress that exceeds the concrete’s tensile strength.
  5. Crazing Cracks: These are very fine surface cracks that do not penetrate deeply into the concrete. They often appear as a network of cracks on the surface and are primarily aesthetic, although they can increase the risk of surface wear.

2. Preventing Cracking in Concrete: Key Steps

Preventing concrete cracks requires attention to detail at every stage, from designing the mix to curing the structure. Below, we’ll outline preventive strategies at each critical stage.


Stage 1: Mix Design

The mix design process significantly impacts shrinkage and cracking. To prevent cracks, consider the following guidelines in your mix design:

  1. Control Water Content: Excess water in the mix is one of the main contributors to shrinkage and cracking. High water content increases the risk of drying shrinkage. The water-cement ratio should be minimized and carefully calculated according to project requirements, with a typical range of 0.4–0.6 for most structural applications.
  2. Use Shrinkage-Reducing Admixtures: Admixtures such as shrinkage-reducing chemicals (SRC) can help mitigate shrinkage by reducing the surface tension of water in the mix, thus reducing shrinkage strains during curing.
  3. Incorporate Supplementary Cementitious Materials (SCMs): SCMs like fly ash, silica fume, and slag can improve durability and reduce shrinkage. These materials improve the mix’s microstructure, leading to better long-term strength and reducing the potential for shrinkage cracking.
  4. Use Proper Aggregate Gradation: Well-graded aggregates reduce void spaces and help minimize the water requirement. Optimizing the size and distribution of aggregates can improve packing density, thereby reducing shrinkage.
  5. Consider Fiber Reinforcement: Adding fibers (such as steel or polypropylene fibers) can help control crack widths by distributing stress more evenly and providing additional tensile strength to the concrete, which can reduce cracking.

Stage 2: Production

Even with a well-designed mix, errors in the production stage can lead to potential cracking. Production processes should aim for consistency, accuracy, and adherence to quality control standards.

  1. Batching Accuracy: Ensure that the batching plant is calibrated, and materials are measured accurately. Deviations in mix proportions can impact the water-cement ratio and increase shrinkage risk.
  2. Temperature Control: Heat generated during the mixing and curing process can accelerate the rate of evaporation, leading to plastic shrinkage cracks. In hot weather, using cooled water or ice as part of the mix can lower the temperature, helping reduce early moisture loss and minimizing thermal stress.
  3. Minimize Delays: The time between mixing and placing should be minimized. Delays can lead to premature setting or require extra water to maintain workability, which increases shrinkage potential.
  4. Quality Control Testing: Regular testing of slump, air content, and temperature during production helps ensure that the concrete meets design specifications, reducing the chance of shrinkage or cracking.

Stage 3: Placing

Proper placement techniques can make a significant difference in preventing cracking. During this stage, attention to detail and technique is crucial.

  1. Place Concrete Continuously: Pouring concrete in a continuous operation reduces the potential for cold joints, which can act as weak points prone to cracking.
  2. Minimize Re-vibration: Excessive or late re-vibration can disturb the setting process, leading to surface shrinkage cracks. Vibration should be applied carefully and only as needed to remove air pockets.
  3. Consider Slabs on Grade: For slabs on grade, proper subgrade preparation and the use of a vapor barrier can help prevent the concrete from absorbing excess moisture from the ground, reducing shrinkage.
  4. Use Control Joints: Control joints provide a predetermined weak point where the concrete can crack in a controlled manner, thus preventing random cracking. Proper spacing of control joints should be based on the type of structure and ambient conditions.
  5. Install Expansion Joints: For larger slabs, expansion joints can allow the concrete to expand and contract with temperature changes, preventing thermal cracking.

Stage 4: Curing

Curing is essential to controlling the rate of moisture loss, which has a direct effect on shrinkage and cracking.

  1. Begin Curing Immediately: Curing should start as soon as the concrete surface is firm enough to retain moisture without being damaged. For most projects, this is within a few hours after finishing.
  2. Use Moisture-Retentive Methods: There are various methods to ensure the concrete retains moisture during the curing period, including:
    • Water Curing: The concrete is kept continuously wet by spraying or ponding water over the surface.
    • Cover Curing: Using wet burlap, plastic sheeting, or curing blankets to prevent moisture loss from the surface.
    • Curing Compounds: These compounds form a protective film on the surface that retains moisture and prevents early evaporation.
  3. Maintain Curing Duration: The curing period should ideally be a minimum of 7 days for standard mixes and up to 14 days for mixes with lower water-cement ratios or in dry climates. Curing duration impacts the concrete’s hydration process, strengthening it and reducing susceptibility to cracking.
  4. Temperature Management: During curing, temperature fluctuations should be minimized, particularly in hot or cold weather. Thermal blankets or insulated coverings can help control the temperature, avoiding thermal cracking.
  5. Avoid Rapid Drying: High temperatures, low humidity, and windy conditions can lead to rapid drying, increasing the risk of plastic shrinkage cracks. Windbreaks, sunshades, or evaporation retarders can help protect the concrete surface from environmental factors.

Preventing shrinkage and cracking in concrete requires a comprehensive approach that addresses each stage of production. By implementing a well-balanced mix design, maintaining stringent quality control during production, using proper placement techniques, and curing the concrete carefully, shrinkage and cracking risks can be minimized. When every stage is managed with attention to detail, you can significantly reduce the likelihood of cracking, leading to a more durable, long-lasting concrete structure.